Pricing Plans

We believe in easy to understand pricing plans. All prices are exclusive of VAT.

Please note that this service is in the pre-launch phase and is being tested by several friendly letting agents. If you wish to be part of our pre-launch phase or be placed on our phase two access list, please email Steve Gubb at steveg@uies.co.uk

 

   

  • Perfect for those companies that can demonstrate that all their electrical infrastructure is monitored and maintained on a regular basis. All works tended to be certificated - previous 100% EICR to be made available if this service is offered.
  • For those customers who are looking to ensure that their premises are safe, who tend to not have on-site maintenance and cannot certify any electrical works carried out, but do have their testing carried out at regular intervals.
  • Those customers are looking to get maximum value out of the testing process. Maintenance may have lapsed or testing not carried out at the prescribed intervals.
  • Confirm the H&S procedures particular to your company
  • Confirm all Risk Assessment/Method Statements issued are in place
  • Confirm with the customer on site the agreed Business Continuity arrangements
  • Carry out a check of all main bonding connections for presence and tightness
  • Conduct a visual inspection of the whole installation and look for any obvious damage or hazards that may be present
  • Carry out a safe isolation procedure and isolate any sensitive equipment/computers that may have a specific shut down procedure
  • Carry out the internal inspection of main switchgear to all accessible equipment
  • Carry out R1 + R2 tests on 20% of all circuits not supplying sockets
  • Re Energize all circuits and appliances and carry out tripping time tests on all RCDs not serving any critical equipment
  • Carry out earth loop impedance tests on all circuits supplying sockets
  • Check all accessible sockets for polarity, cross connections missing earth etc
  • Out of Hours Service
  • Provide a one to one debrief on the findings in the report
  • Discuss the requirement for the requirement of additional testing should the sample testing find any unsatisfactory results
  • Carry out R1 + R2 tests and earth loop impedance tests on all circuits
  • Trace all unknown circuits (subject to max of ten mins per circuit)
  • Provide updated distribution board charts for identified circuits
  • Supply and install any missing blanks (Din Rail industry standard) or grommets to any distribution boards during testing to reduce the remedial costs where available.
  • Distribution Board schematic showing sub main circuit from the origin inc cable sizes, types device sizes in DWG &/or PDF file format.
  • Site visit by a senior member of staff for a full explanation of the findings mentioned on the certificate.

EICR-Business Basic

£119.00 One bed property extra bedrooms £15.00 each

  • Perfect for those companies that can demonstrate that all their electrical infrastructure is monitored and maintained on a regular basis. All works tended to be certificated - previous 100% EICR to be made available if this service is offered.
  • Confirm the H&S procedures particular to your company
  • Confirm all Risk Assessment/Method Statements issued are in place
  • Confirm with the customer on site the agreed Business Continuity arrangements
  • Carry out a check of all main bonding connections for presence and tightness
  • Conduct a visual inspection of the whole installation and look for any obvious damage or hazards that may be present
  • Carry out a safe isolation procedure and isolate any sensitive equipment/computers that may have a specific shut down procedure
  • Carry out the internal inspection of main switchgear to all accessible equipment NO
  • Carry out R1 + R2 tests on 20% of all circuits not supplying sockets NO
  • Re Energize all circuits and appliances and carry out tripping time tests on all RCDs not serving any critical equipment NO
  • Carry out earth loop impedance tests on all circuits supplying sockets NO
  • Check all accessible sockets for polarity, cross connections missing earth etc NO
  • Out of Hours Service NO
  • Provide a one to one debrief on the findings in the report NO
  • Discuss the requirement for the requirement of additional testing should the sample testing find any unsatisfactory results NO
  • Carry out R1 + R2 tests and earth loop impedance tests on all circuits NO
  • Trace all unknown circuits (subject to max of ten mins per circuit) NO
  • Provide updated distribution board charts for identified circuits NO
  • Supply and install any missing blanks (Din Rail industry standard) or grommets to any distribution boards during testing to reduce the remedial costs where available. NO
  • Distribution Board schematic showing sub main circuit from the origin inc cable sizes, types device sizes in DWG &/or PDF file format. NO
  • Site visit by a senior member of staff for a full explanation of the findings mentioned on the certificate. NO
  • NO
  • NO
  • NO

Letting Agents Premium Test 100

£136.00 One bed property extra bedrooms £15.00 each

  • Perfect for those companies that can demonstrate that all their electrical infrastructure is monitored and maintained on a regular basis. All works tended to be certificated - previous 100% EICR to be made available if this service is offered.
  • For those customers who are looking to ensure that their premises are safe, who tend to not have on-site maintenance and cannot certify any electrical works carried out, but do have their testing carried out at regular intervals.
  • Those customers are looking to get maximum value out of the testing process. Maintenance may have lapsed or testing not carried out at the prescribed intervals.
  • Confirm the H&S procedures particular to your company
  • Confirm all Risk Assessment/Method Statements issued are in place
  • Confirm with the customer on site the agreed Business Continuity arrangements
  • Carry out a check of all main bonding connections for presence and tightness
  • Conduct a visual inspection of the whole installation and look for any obvious damage or hazards that may be present
  • Carry out a safe isolation procedure and isolate any sensitive equipment/computers that may have a specific shut down procedure
  • Carry out the internal inspection of main switchgear to all accessible equipment
  • Carry out R1 + R2 tests on 20% of all circuits not supplying sockets
  • Re Energize all circuits and appliances and carry out tripping time tests on all RCDs not serving any critical equipment
  • Carry out earth loop impedance tests on all circuits supplying sockets

Letting Agents Business Test 100

£119.00 One bed property extra bedrooms £15.00 each

  • Perfect for those companies that can demonstrate that all their electrical infrastructure is monitored and maintained on a regular basis. All works tended to be certificated - previous 100% EICR to be made available if this service is offered.
  • For those customers who are looking to ensure that their premises are safe, who tend to not have on-site maintenance and cannot certify any electrical works carried out, but do have their testing carried out at regular intervals.
  • Those customers are looking to get maximum value out of the testing process. Maintenance may have lapsed or testing not carried out at the prescribed intervals.
  • Confirm the H&S procedures particular to your company
  • Confirm all Risk Assessment/Method Statements issued are in place
  • Confirm with the customer on site the agreed Business Continuity arrangements
  • Carry out a check of all main bonding connections for presence and tightness
  • Conduct a visual inspection of the whole installation and look for any obvious damage or hazards that may be present
  • Carry out a safe isolation procedure and isolate any sensitive equipment/computers that may have a specific shut down procedure
  • Carry out the internal inspection of main switchgear to all accessible equipment NO
  • Carry out R1 + R2 tests on 20% of all circuits not supplying sockets NO
  • Re Energize all circuits and appliances and carry out tripping time tests on all RCDs not serving any critical equipment NO
  • Carry out earth loop impedance tests on all circuits supplying sockets NO
Perfect for those companies that can demonstrate that all their electrical infrastructure is monitored and maintained on a regular basis. All works tended to be certificated - previous 100% EICR to be made available if this service is offered.
For those customers who are looking to ensure that their premises are safe, who tend to not have on-site maintenance and cannot certify any electrical works carried out, but do have their testing carried out at regular intervals.
Those customers are looking to get maximum value out of the testing process. Maintenance may have lapsed or testing not carried out at the prescribed intervals.
Confirm the H&S procedures particular to your company
Confirm all Risk Assessment/Method Statements issued are in place
Confirm with the customer on site the agreed Business Continuity arrangements
Carry out a check of all main bonding connections for presence and tightness
Conduct a visual inspection of the whole installation and look for any obvious damage or hazards that may be present
Carry out a safe isolation procedure and isolate any sensitive equipment/computers that may have a specific shut down procedure